Interior Construction Wraps Up, Possible New Exterior Signage Under Construction at The Seas Pavilion in EPCOT
Summary by Blog Mickey - Disney News
1 Articles
1 Articles
All
Left
Center
Right
Interior Construction Wraps Up, Possible New Exterior Signage Under Construction at The Seas Pavilion in EPCOT
Last week, The Seas Pavilion returned to normal operating hours after months and months of a shortened schedule. The return to normal hours coincided with the completion of interior construction on the escalators and surrounding areas. The shortened hours were likely put in place to allow “after hours” construction to take place before bedtime for the fish and marine life in the building. With interior construction now complete, the pavilion can…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage