Truly Understand the News.
Published loading...Updated

This Month, Celsia Will Launch Its First Wind Farm

Summary by Periódico Vivir en El Poblado
The new Carreto wind farm will generate approximately 30 GWh of clean energy per year, which will be injected into the National Interconnected System, contributing to the diversification of the energy matrix of Colombia. It has two last generation wind turbines, each of 4.8 MW capacity. Each one’s structure has as its base a tower [...] La entrada This month, Celsia will put into operation its first wind farm aparece primero en Vivir en El Pobla…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

The new Carreto wind farm will generate approximately 30 GWh of clean energy per year, which will be injected into the National Interconnected System, contributing to the diversification of the energy matrix of Colombia. It has two last generation wind turbines, each of 4.8 MW capacity. Each one’s structure has as its base a tower [...] La entrada This month, Celsia will put into operation its first wind farm aparece primero en Vivir en El Pobla…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Periódico Vivir en El Poblado broke the news in on Saturday, June 7, 2025.
Sources are mostly out of (0)