Rosneft Implements New Technology to Optimize Well Construction
Summary by ROGTEC
1 Articles
1 Articles
All
Left
Center
Right
Rosneft Implements New Technology to Optimize Well Construction
Specialists from Orenburgneft have implemented a domestically developed innovation that allows for a reduction in the length of expensive casing strings by using a large-diameter cemented liner hanger. The actual economic effect of this innovation amounts to over 3.5 million rubles per well. The reduction in the metal intensity of the well design made it possible to cut casing costs by an average of 24% and reduce drilling time by nearly 10 hour…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium