Don't Just Read the News, Understand It.
Published loading...Updated

A fire ravages a warehouse of a recycling plant in the industrial zone of Amiens Nord

Summary
A major fire broke out on the evening of Monday, January 27, in the warehouse of the Paprec factory in Amiens. The fire is under control, but 80 firefighters are still on site trying to put out the flames.

3 Articles

All
Left
1
Center
Right
Lean Left

The fire started on Monday around 8 p.m., according to the prefecture. 45 vehicles and a hundred Sdis 80 personnel are mobilized on the site.

·Strasbourg, France
Read Full Article

On January 29, 2025, a fire broke out at a recycling factory. There were a large number of piles of tires inside the warehouse. The warehouse has collapsed and the fire is still out of control. The flames are rising very high and scary. Most recently, Mr. Naris Niramaiwong, the governor of Samut Sakhon Province, along with the head of disaster prevention and mitigation of Samut Sakhon Province, the provincial industry of Samut Sakhon, and the di…

Read Full Article

11,000 square meters have been destroyed and toxicological tests have been carried out in the surrounding municipalities. The site is not Seveso classified A fire destroyed 11,000 m2 of a site in Paprec,

·France
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

France Info broke the news in Strasbourg, France on Monday, January 27, 2025.
Sources are mostly out of (0)

Similar News Topics