Published • loading... • Updated
Work wraps up on Alexandria's busy Third Avenue
Summary by Echo Press
1 Articles
1 Articles
Work wraps up on Alexandria's busy Third Avenue
ALEXANDRIA — A major road construction project on Third Avenue/State Highway 29 wrapped up last week. Work started on Sept. 2 and Third Avenue was reduced to one lane of traffic in both directions between Broadway and Nokomis streets. The work began in the outside lanes, and switched about halfway through construction to the inside lanes. The project's goal is to improve pedestrian safety on the seven-block section of the street, which sees an a…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right1Center0Last UpdatedBias Distribution100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium
