Published • loading... • Updated
Trans Mountain pipeline project runs into fresh construction-related hurdle
- The Trans Mountain oil pipeline expansion project is facing a potential delay due to engineering difficulties with drilling a tunnel in British Columbia.
- Trans Mountain Corp. has requested to modify the route and construction method for a 1.3-kilometre stretch of pipe to overcome these challenges.
- The Stk'emlupsemc te Secwepemc Nation, whose territory the pipeline crosses, opposes the proposed changes as they had previously agreed to the original route and construction method.
Insights by Ground AI
31 Articles
31 Articles
Coverage Details
Total News Sources31
Leaning Left26Leaning Right2Center1Last UpdatedBias Distribution90% Left
Bias Distribution
- 90% of the sources lean Left
90% Left
L 90%
Factuality
To view factuality data please Upgrade to Premium









