Temporary reduced load limit for historic bridge on key freight link
Summary by Big Rigs
1 Articles
1 Articles
All
Left
Center
Right
Temporary reduced load limit for historic bridge on key freight link
The new load limit is expected to be in place for around six months, adding about 40 kilometres and 30 minutes to the journey for all vehicles over 23 tonne. Image: TfNSW The heavy vehicle load limit on an historic timber truss bridge in the NSW’s Central West will be temporarily reduced until a bridge strengthening structure can be installed. Paytens Bridge on Paytens Bridge Road, 11 kilometres south-west of Eugowra, was built in 1926 and is th…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage