Stalled Rothesay Pavilion restoration back on track : April 2025 : News : Architecture in profile the building environment in Scotland - Urban Realm
Summary by Urban Realm
1 Articles
1 Articles
All
Left
Center
Right
Stalled Rothesay Pavilion restoration back on track : April 2025 : News : Architecture in profile the building environment in Scotland - Urban Realm
Work to bring the celebrated Rothesay Pavilion back to life is progressing apace with attention turning to the lower ground floor following structural repairs to the upper floor. Having made the structure wind and watertight Robertson Construction are heading downstairs for further strengthening and drainage works, including restoration of the original box office and renovation of the cafe....
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium