ÖBB Give the Green Light: the Western Route Will Soon Be Navigable
7 Articles
7 Articles
Good news for shanked commuters: The comeback of Tempo 230 is imminent on the Westbahn line in Lower Austria. According to ÖBB, the final repair work after the flood of September 2024 ends according to schedule. From Friday the connection in the Tullnerfeld is free again and the diversion through the Vienna Forest with 30 minutes longer journey time in the Vienna – St. Pölten section thus history. ÖBB and Westbahn return to the regular timetable…
On the western railway line in Lower Austria Tempo 230 comes back again: According to ÖBB, the final repair work after the flood of September 2024 ends as planned.
The Westbahn line in Lower Austria is again open for speed 230 from Friday. Repair work after the devastating flood disaster in September 2024 can be completed this week.
After the floods in September 2024, final repairs will end as scheduled. The route in Tullnerfeld will be free again from Friday.
SANKT P LTEN. The comeback of Tempo 230 is imminent on the western railway line in Lower Austria.


Tempo 230 returns to the western railway line in Lower Austria
Coverage Details
Bias Distribution
- 100% of the sources lean Right
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage