Rendsburg Suspended Ferry Will Be Repaired From the End of July – Still No Date for Return
2 Articles
2 Articles
The repair of the defective Rendsburg floating ferry on the Nord-Ostsee-Kanal is scheduled to start at the end of July. However, a return to the SH Netz Cup in August is considered unlikely. The current failure is already a negative record.
The suspended ferry East Hemmoor is a pioneer construction of engineering technology – now rust requires extensive measures. We look at an exciting history. The post suspended ferry over the east: A giant from 248 t steel first appeared on ingenieur.de - Jobbörse und Nachrichtenportal für Ingenieure.
·Düsseldorf, Germany
Read Full ArticleCoverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium