New Pedestrian Bridge Opens on Kilometer 9 of Duarte Highway #Fvdigital
5 Articles
5 Articles
The Ministry of Public Works and Communications (MOPC) reported that on Sunday the removal of the old pedestrian bridge will take place on Kilometer 9 of the Duarte Highway, which will imply temporary closure of the road and detours for drivers. The intervention will begin at 7:00 p.m. on Sunday 29 and will extend until 5:00 a.m. on Monday 30. During this time the express lanes and marginal roads will be closed in both directions while the work …
The Ministry of Public Works and Communications (MOPC) announced that the old pedestrian bridge located at kilometer 9 of the Duarte Highway will be removed this Sunday, March 29, during nighttime hours, as part of the road transformation work in the area. The institution reported that the work will take place from 7:00 p.m. until 5:00 a.m. on Monday, March 30, during which time the express lanes and service roads will be closed in both directio…
The new pedestrian bridge of Kilometer 9 of the Duarte Highway is already in operation since this Saturday, offering passersby a safer and more accessible crossing in one of the busiest areas of the capital. (Read more...) The entrance Inauguran new pedestrian bridge in Kilometer 9 was first published in Remolacha - News Dominican Republic.
Santo Domingo.- The new pedestrian bridge of Kilometer 9 of the Duarte Highway is already in operation from Saturday night, offering passersby a safer and more accessible crossing in one of the busiest areas of the capital. The structure allows citizens to move without the pressure of vehicle traffic, eliminating the need to calculate distances or run between vehicles. In addition, it connects directly with the María Montez station of the Metro …
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium




