Monsoon in Delhi: desilting work on; Oppn. attacks BJP govt. for missing deadlines
Summary by The Hindu
2 Articles
2 Articles
All
Left
1
Center
Right
1
Monsoon in Delhi: desilting work on; Oppn. attacks BJP govt. for missing deadlines
PWD and MCD, which manage most of city’s drainage, have finished cleaning 85% and 80% of their drains respectively; AAP, Congress criticise govt.’s ‘inaction’; IMD forecasts rains every day till July 6
·India
Read Full ArticleIn the last 20 years, highways and infrastructure developed around IGI airport, but no plan was made to save or connect the old drains. NHAI built roads, MCD took care of internal drains, the airport looked after its network and DMRC worked on the metro. But no one thought about where the remaining water would go.
Coverage Details
Total News Sources2
Leaning Left1Leaning Right1Center0Last UpdatedBias Distribution50% Left, 50% Right
Bias Distribution
- 50% of the sources lean Left, 50% of the sources lean Right
50% Right
L 50%
R 50%
Factuality
To view factuality data please Upgrade to Premium