Published 9 days ago • loading... • Updated 9 days agoShow Less IconKharar-Banur road: Power bill pending, 4 high-mast lights non-functional for months Summary by Hindustan TimesCommuters, meanwhile, are on the receiving end, as the non-functional lights have left the stretch prone to accidents. Residents said some of the LED fittings had stopped functioning even before the electricity supply was disconnectedShare menu1 Articles1 ArticlesAllLeftCenter1RightSearch IconSort IconHindustan TimesCenterFactualityOwnershipKharar-Banur road: Power bill pending, 4 high-mast lights non-functional for monthsCommuters, meanwhile, are on the receiving end, as the non-functional lights have left the stretch prone to accidents. Residents said some of the LED fittings had stopped functioning even before the electricity supply was disconnected9 days ago·New Delhi, IndiaRead Full ArticleThink freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribeBlindspot Title And LogoStories disproportionately reported by the Left or the RightSee More BlindspotsCoverage DetailsTotal News Sources1Leaning Left0Leaning Right0Center1Last Updated9 days agoBias Distribution100% CenterBias Distribution Too Big Arrow IconToo Big Arrow IconCaret Up Icon100% of the sources are Center100% CenterC 100%Factuality Info IconTo view factuality data please Upgrade to PremiumOwnership Info IconTo view ownership data please Upgrade to VantageHindustan Times broke the news in New Delhi, India 9 days ago on Monday, September 21, 2026.Too Big Arrow IconCaret Down IconSources are mostly out of (0)Similar News TopicsKharar Plus IconShow AllBlindspot Title And LogoStories disproportionately reported by the Left or the RightSee More BlindspotsSimilar News TopicsKharar Plus IconShow All