Published • loading... • Updated
ITC Conducting Helicopter Inspection Of Transmission Lines In September
Summary by MITechNews
1 Articles
1 Articles
ITC Conducting Helicopter Inspection Of Transmission Lines In September
NOVI – ITC will be conducting aerial patrols of the high-voltage transmission structures and lines in Michigan from Sept. 8-Oct. 3, weather permitting. The helicopter patrols are conducted to provide an overall status of the overhead transmission system that is operated by ITC’s Michigan operating entities, ITCTransmission and Michigan Electric Transmission Company. The aerial inspections are scheduled across most of Michigan’s Lower Peninsula, …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium