See every side of every news story
Published loading...Updated

Installation of Stormwater Drainage Lines Will Begin Today in Front of the Sun Bridge and on Worker Street.

Summary by ikon.mn
In the 26th khoroo of Bayangol district, Engels Street or in front of the Sun Bridge, pedestrian and roadways are flooded every time it rains and are often pumped out during the rain. Preparations have been made to install a one-kilometer rainwater drainage line at this location starting today. Employees of the Department of Geodesy, Water Construction and Facilities of the Ministry of Civil Engineering and Construction will install the line. In…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

In the 26th khoroo of Bayangol district, Engels Street or in front of the Sun Bridge, pedestrian and roadways are flooded every time it rains and are often pumped out during the rain. Preparations have been made to install a one-kilometer rainwater drainage line at this location starting today. Employees of the Department of Geodesy, Water Construction and Facilities of the Ministry of Civil Engineering and Construction will install the line. In…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ikon.mn broke the news in on Monday, June 2, 2025.
Sources are mostly out of (0)