Indian Railways has completed excavation of the 5.3-km Tunnel No. 10, the longest on the 45-km Sivok-Rangpo railway project, marking the completion of tunnelling work across all 14 tunnels. The milestone brings Sikkim closer to its first railway connectivity, with track laying and safety installations next.