Published • loading... • Updated
Hydroelectric Project – Negotiations on the Purchase Price of Electricity to Be Produced in Volobe Continue to Slow Down the Project
A tariff arm keeps the Volobe yard under high pressure. The hydroelectric project is again slowing down due to the negotiations on the price of kilowatthour at which the Jirama will buy the electricity produced by the future power plant. The president of the Republic Refoundation, Colonel Michael Randrianirina, had reported, in Toamasina, a significant difference of up to 80% between the developer's offer and the threshold of acceptability of th…
1 Articles
1 Articles
A tariff arm keeps the Volobe yard under high pressure. The hydroelectric project is again slowing down due to the negotiations on the price of kilowatthour at which the Jirama will buy the electricity produced by the future power plant. The president of the Republic Refoundation, Colonel Michael Randrianirina, had reported, in Toamasina, a significant difference of up to 80% between the developer's offer and the threshold of acceptability of th…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium