How a WW2-era factory is cutting production time by 80 percent
Summary by Robotics & Automation News
1 Articles
1 Articles
How a WW2-era factory is cutting production time by 80 percent
Inside a compact production cell at Collins Aerospace’s wheel-and-brake facility in Troy, Ohio, two advanced machines now replace the five legacy machines once needed to produce aircraft wheels. Together, they can cut production time from 45 days to just seven – a push the team calls “Wheels in a Week.” Greg Smith, director of operations, […]
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium