Published • loading... • Updated
How 100 Million kWh of Xinjiang Renewables Is Powering Chongqing’s Energy Transition
Summary by iChongqing
1 Articles
1 Articles
How 100 Million kWh of Xinjiang Renewables Is Powering Chongqing’s Energy Transition
In Xinjiang, workers installed lead wires for the capacitor bank equipment of the "Xinjiang Power to Chongqing" project. (Photo/Li Song) Chongqing - The “Xinjiang Power to Chongqing” project has recently hit a key milestone, with real-time monitoring data showing that Chongqing has now received more than 10 billion kilowatt-hours of electricity from Xinjiang. As China’s first ultra-high-voltage direct current (UHVDC) line directly connecting the…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium