See every side of every news story
Published loading...Updated

Design contract awarded for proposed phase two of LNG Canada project in Kitimat – Energeticcity.ca

Summary by Energetic City
The LNG Canada Kitimat facility. (THE CANADIAN PRESS/Darryl Dyck) KITIMAT, B.C. — A joint engineering venture has been awarded the contract to update design plans for a possible second phase of the LNG Canada facility in Kitimat. In a press release issued on August 1st, it was revealed Fluor and JGC corporations have been picked to update the ‘front-end engineering and design’ (FEED) plans for the facility. This comes as LNG Canada exported its …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

LNG Industry broke the news in on Monday, August 4, 2025.
Sources are mostly out of (0)