CR Electric Goes the Distance on High-Voltage Well Project
Summary by Business Journal Daily
1 Articles
1 Articles
All
Left
Center
Right
CR Electric Goes the Distance on High-Voltage Well Project
VIENNA, Ohio – The call to bring power back to the Copper Ridge injection well in Vienna meant activating a full-scale, high-voltage operation for Girard-based electrical contractor CR Electric. It’s an atypical job that demanded some engineering expertise, heavy duty equipment and thousands of feet of wire. “The well site is about 4,000 feet back […] The post CR Electric Goes the Distance on High-Voltage Well Project appeared first on Business …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium