Port of LA’s Gene Seroka Rolls Out a Long List of Plans Coming for 2026
Port of Los Angeles plans a 200-acre terminal expansion, new cruise terminal, and zero-emission equipment to prepare for cargo growth and the 2028 Olympics, with 10.2 million containers moved in 2025.
5 Articles
5 Articles
Port of LA’s Gene Seroka rolls out a long list of plans coming for 2026
Despite a rollercoaster year with tariffs, and cargo peaks and dips, the Port of Los Angeles saw near-record numbers in 2025 — and is actively preparing for significant growth anticipated to come in 2026. In his 11th annual State of the Port speech on Thursday, Jan. 22, POLA Executive Director Gene Seroka outlined the ambitious road ahead as the port braces for major expansion, including plans to build a 200-acre container terminal — Pier 500 Ma…
Port Of Los Angeles Selects Pacific Cruise Terminals As Developer And Operator Of Two Cruise Centers
New Outer Harbor Cruise Terminal and Redeveloped World Cruise Center to Significantly Expand Port’s Cruise Business Capacity. The Port of Los Angeles has announced that Pacific Cruise Terminals, LLC (PCT), a joint venture between Carrix, Inc. and JLC Infrastructure, has been selected as the developer and operator of the future Outer Harbor cruise terminal. PCT will also take on redevelopment and operation of the existing World Cruise Center on t…
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium


