Published • loading... • Updated
100-Year-Old Bridge Reopens In Upper Providence Twp.
Summary by Patch
2 Articles
2 Articles
Black Rock Road reopens, bridge replacement completed in Upper Providence
UPPER PROVIDENCE — The Pennsylvania Department of Transportation announced that construction has been completed a month ahead of schedule on the project to replace the bridge that carries Black Rock Road over Crossmans Run in Upper Providence Township. The bridge and roadway were reopened at 2:30 PM on Wednesday. The bridge had been closed since May 12 to allow PennDOT’s contractor to replace the 100-year-old, single-span structure, which had be…
·Pennsylvania, United States
Read Full ArticleCoverage Details
Total News Sources2
Leaning Left0Leaning Right0Center2Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium

