Published • loading... • Updated
48-MW solar project built along Ohio River comes online
Summary by Solar Power World
1 Articles
1 Articles
48-MW solar project built along Ohio River comes online
Doral Renewables‘ Great Bend Solar project reached commercial operation on January 6. The project met substantial completion in December 2025. The 48-MW project, located in Meigs County, was built on the Great Bend of the Ohio River, near the state border with West Virginia. Doral Renewables commissioned PCL Construction in April 2024 to build the… The post 48-MW solar project built along Ohio River comes online appeared first on Solar Power Wor…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
