Portion of Soil over Under-Construction Rail Tunnel Collapses in Odisha - OrissaPOST
6 Articles
6 Articles
Collapse of portion of under-construction rail tunnel on Khordha-Balangir route raises eyebrows
Boudh: Concerns about the quality of work on the Khordha-Balangir railway route being raised after a portion of an under-construction tunnel caved in this evening. Casualties due to the collapse of the four-km-long under-construction tunnel at Adenigada in Boudh district are yet to be known. A crater of 30 meters has formed on the ground following the cave in. Sources said as the construction company—GR Infraprojects has been given deadline, wor…
Portion of soil over under-construction rail tunnel collapses in Odisha - OrissaPOST
Boudh: A portion of the top soil over an under-construction railway tunnel caved in near Adenigarh in Odisha’s Boudh district, an official said Monday. No one was injured in the incident that took place on the Khurda Road-Bolangir rail line stretch, he said. “A minor incident of soil caving-in occurred this afternoon at Tunnel No. 4 on the Khurda-Bolangir railway line. It was due to loose soil formation and continuous rainfall in the area,” the …
Odisha: Under-construction tunnel collapses on Khordha-Balangir Rail Line - Update Odisha-Latest Odisha News I Breaking News
Boudh: Safety concerns have surfaced regarding the quality of construction on the Khordha-Balangir railway line after a section of an under-construction tunnel collapsed this evening in Boudh district. The incident occurred at Tunnel No. 4 near Adenigada, where a 30-meter-wide crater formed following the cave-in of a portion of the 4-kilometer-long tunnel. The extent of casualties remains unclear, although fears persist that workers may have bee…
ECoR Issues Clarification On Khurda-Balangir Rail Tunnel Collapse In Odisha’s Boudh
Boudh: The East Coast Railway (ECoR) on Monday issued a clarification amid reports that a portion of an under-construction tunnel on Khurda Road-Balangir rail line project had caved in near Adenigarh in Boudh district, raising concerns about the quality of work. “A minor soil caving in occurred this afternoon at Tunnel No. 4 on the Khurda-Balangir railway line,” the ECoR said, attributing the incident to loose soil formation and continuous rainf…
Odisha Tunnel Collapse Scare: ECoR Blames Rainfall for Soil Caving at Khordha-Balangir Project
A minor soil caving incident occurred at Tunnel No. 4 of the Khordha-Balangir railway project in Odisha’s Boudh district. The tunnel, located near Adenigarh in the Harabhanga block and stretching over 4.25 kilometres, is one of India’s longest railway tunnels. According to a clarification issued by the East Coast Railway (ECoR), the incident was triggered […] The post Odisha Tunnel Collapse Scare: ECoR Blames Rainfall for Soil Caving at Khordha-…
Under-construction Railway tunnel in Odisha caves in: ECoRly says no life trapped
Boudh, May 26: The under-construction Khordha-Balangir Rail Tunnel that accidentally caved in on Monday trapped no life under it, said the East Coast Railways.On being informed of the mishap this evening, the East Coast Railways authorities took stock of the situation from the ground and clarified that no worker has been stranded under the debris of the partly broken tunnel.The Khordha-Balangir Rail Tunnel that was under construction near Odisha…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage