Published • loading... • Updated
UERC Rejects 50 MW Solar Power Proposal In Uttarakhand Over Net Metering Constraints
Summary by solarquarter.com
1 Articles
1 Articles
UERC Rejects 50 MW Solar Power Proposal In Uttarakhand Over Net Metering Constraints
A petition was filed before the Uttarakhand Electricity Regulatory Commission by the Van Panchayat Adhar Mafi, Almora, seeking permission to set up a 50 MW solar power plant in the […] The post UERC Rejects 50 MW Solar Power Proposal In Uttarakhand Over Net Metering Constraints appeared first on SolarQuarter.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium