Published • loading... • Updated
To ensure compliance with sanctioned building plans, demolition drive carried out at Elante Mall
Summary by Pop News
1 Articles
1 Articles
To ensure compliance with sanctioned building plans, demolition drive carried out at Elante Mall
The State Office carried out a major demolition campaign in the Elante shopping center to eliminate unauthorized construction. They said the campaign was carried out to restore compliance with authorized construction plans. During the physical inspection carried out on August 8, 2025, multiple violations were detected at the site, carried out without prior approval from the competent authority. Accordingly, a show cause notice was issued to the …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium