Is the RN Looking Forward to the Reopening of the Fessenheim Power Plant?
13 Articles
13 Articles
On Wednesday evening, the National Assembly adopted an amendment to reboot the Fessenheim nuclear power plant, which was closed in 2020. A victory which members of the group welcome, starting with Marine Le Pen, who has always been against this closure and regularly calls for the reactivation of its reactors. But is that only possible? - Does the RN look forward too soon to having obtained the reopening of the Fessenheim power plant? (Policy).
On Wednesday, 18 June, the National Assembly adopted an amendment proposed by the National Assembly, which aims to reactivate the Fessenheim nuclear power plant, whose activity had ceased in 2020. This measure is part of the consideration of the proposal for a law on national energy and climate programming covering the period 2025-2035. It is precisely during the study of a subamendment to Article 3 that a brief suspension of the sitting was pro…
The National Assembly, the majority in the Chamber after a sitting suspension, adopted one of its amendments aimed at reviving the plant, whose reactors were shut down in 2020.
In an overheated political climate, the National Assembly adopted on the eve of 19 June an unexpected amendment proposed by the National Assembly. Its aim ? To activate the restart of the Fessenheim nuclear power plant (Haut-Rhin), though stopped since 2020. The amendment came to blow on the embers of a dossier that many believed was permanently extinguished. But the next day, the cuter fell. At a press conference held in Strasbourg on Thursday …
Fessenheim: a symbolic vote disconnected from the realities Fessenheim's name has resurfaced in the National Assembly, following an unexpected and essentially symbolic amendment. Adopted on the night of 18-19 June 2025, the text worn by the RN, supported by a coalition of circumstances LR and some MPs overseas, calls for the restart of a power plant that was stopped five years ago. This vote comes the very day before the ASNR presented its annua…
France's parliament decides to take the near-border nuclear power plant Fessenheim back on the grid. Five years ago, it was shut down at the urging of Germany. Now we could be the biggest beneficiary. This post At the request of Le Pen France, nuclear power plant in Alsace reopened was published on JUNGE FREIHEIT.
Coverage Details
Bias Distribution
- 67% of the sources lean Right
To view factuality data please Upgrade to Premium