Northwest Seaport Alliance Completes Shore Power System at Husky Terminal
5 Articles
5 Articles


Northwest Seaport Alliance completes shore power system at Husky Terminal
The Northwest Seaport Alliance (NWSA) has installed shore power at Husky Terminal in Tacoma, Washington. This project was supported by contributions from several different grant programs. It received direct support from the Washington State Legislature through a grant award from the VW Settlement Agreement Funds, with funding also coming from the EPA’s Diesel Emission Reduction
The Northwest Seaport Alliance Completes Shore Power System at Husky Terminal – The Suburban Times
Northwest Seaport Alliance press release. The Northwest Seaport Alliance (NWSA) is excited to announce the completion of shore power at Husky Terminal in Tacoma. June 15th the terminal welcomed Hapag-Lloyd’s Kuala Lumpur Express as its inaugural shore power plug-in. The successful plug-in is a significant step in the NWSA’s Northwest Clean Ports Clean Air Strategy drive towards emissions reductions throughout our gateway. The Kuala Lumpur Expres…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium