SACE Comments Opposing Water Quality Certification of the Enbridge T15 - Southern Alliance for Clean Energy (SACE)
Summary by SACE | Southern Alliance for Clean Energy
1 Articles
1 Articles
SACE Comments Opposing Water Quality Certification of the Enbridge T15 - Southern Alliance for Clean Energy (SACE)
SACE filed comments on July 25th in the NC DEQ Section 401 water quality certification proceeding for the PSNC/Enbridge T15 Reliability Project. The T15 Project would place a new large diameter, high-pressure fracked gas pipeline next to the existing T15 pipeline that starts at an interconnection with Williams’ Transco pipeline near the Dan River in Rockingham County. The pipeline would stretch for 45 miles across Rockingham, Caswell, and Person…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium