Anda Concludes Main Pipe Repair and Confirms Gradual Restoration of Drinking Water Service - Today's News in El Salvador
5 Articles
5 Articles
The president of the National Administration of Aqueducts and Sewerage (ANDA), Dagoberto Arévalo, confirmed this Sunday the completion of the repair work in the North Zone System, after successfully completing the final hydraulic testing phase. Arévalo explained that this stage allowed to verify the stability of the pressure and the proper functioning of the [...] The post ANDA completes repair of the North Zone System and announces gradual rest…
“Our commitment is to guarantee a safe and continuous service for Salvadoran families,” said ANDA. EL SALVADOR.- The president of the National Administration of Aqueducts and Sewerage (ANDA), Dagoberto Arévalo, reported that the North Zone System has been completely repaired and is already in operation, after the five stage of the repairs, which consisted in carrying out hydraulic tests, was successfully completed. Arévalo explained that “the pu…
The president of ANDA, Dagoberto Arévalo, supervises in the field the progress in the repair of the 48-inch pipeline of the North Zone System, key infrastructure for water supply in the Metropolitan Area of San Salvador (AMSS). Arévalo explained that the fourth phase of the project is currently being developed, consisting of the installation of the pipe sections and the cots that will serve as support. “We are already installing the pipes, this …
The president of the National Administration of Aqueducts and Sewerage (ANDA), Dagoberto Arévalo, reported that the works of repair of the 48-inch pipe of the North Zone System are progressing with the installation and reinforcement of the beams that will support the duct. “We continue with phase 4. At this moment the beams have been installed, they are already reinforced and what is being prepared are the cots where the pipe is going to be held…
Día a Día News El Salvador–The president of the National Water and Sewer Administration (ANDA), Dagoberto Arévalo, reported Friday night that the repair of the main drinking water pipeline in San Salvador is on schedule. Technical teams are currently executing the fourth phase of the project, considered the most complex and crucial to restoring service. Arévalo emphasized that the work is being carried out continuously and that the crews are ope…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium