Removal of Temporary Traffic Signal Scheduled near the MO 47/U.S. 61 Interchange at Troy | Missouri Department of Transportation
Summary by modot.org
1 Articles
1 Articles
Removal of Temporary Traffic Signal Scheduled near the MO 47/U.S. 61 Interchange at Troy | Missouri Department of Transportation
Removal of Temporary Traffic Signal Scheduled near the MO 47/U.S. 61 Interchange at Troy Visitor (not verified) Thu, 06/26/2025 - 15:40 North Lincoln Drive Removal Scheduled Mid-July HANNIBAL – Motorists will notice the removal of the traffic control device utilized during construction on the nearby Missouri Route 47 and U.S. Route 61 interchange at Troy. Weather permitting, as early as July 8, contractor crews will be removing the temporary tra…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium