Power line relocation issues could delay work on the Telegraph Road culvert/bridge
Summary by perugazette.com
1 Articles
1 Articles
All
Left
Center
Right
Power line relocation issues could delay work on the Telegraph Road culvert/bridge
June 23, 2025, Peru Town Board Meeting - Highway Superintendent Michael Farrell reported electric line relocation issues related to the closed Telegraph Road culvert/bridge that could delay the project. The large crane required to install the heavy box culvert needs a wide-clearance space, resulting in the relocation of power poles. Thus far, neither of the
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium