See every side of every news story
Published loading...Updated

How A Shortfall Of Rs 52 Lakh Delayed Kashmir Rail Link By 133 Years

  • The Jammu-Srinagar Vande Bharat Express will connect the Kashmir Valley by rail for the first time, after a 133-year delay caused by a Rs 52-lakh shortfall.
  • The vision of a rail link dates back to 1892 under Maharaja Pratap Singh, who proposed a 197.5-km Light Electric Railway.
  • The Udhampur-Srinagar-Baramulla Rail Link was launched in 1994, costing Rs 41,119 crore, and includes the world's highest railway bridge, the Chenab Bridge.
  • Dr. Jitendra Singh expressed excitement about the inauguration, stating the Chenab Bridge is a monumental achievement of Indian Railways.
Insights by Ground AI
Does this summary seem wrong?

16 Articles

All
Left
Center
Right
3
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

AsiaOne News, AsiaOne Latest News, AsiaOne Magazine India | broke the news in on Monday, April 14, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.