See every side of every news story
Published loading...Updated

PetroGreen energizes Isuzu plant with solar power

Summary by Inquirer
MANILA, Philippines — Yuchengco-led PetroGreen Energy Corp. (PGEC) has activated a 3-megawatt (MW) solar rooftop power facility for a manufacturing plant in Laguna. The project, considered the “largest” rooftop solar facility yet in Laguna Technopark, is for the Isuzu Autoparts Manufacturing Corp.’s (IAMC) facility in Biñan. IAMC, a subsidiary of Japan’s Isuzu Motors Limited, is

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Inquirer broke the news in Manila, Philippines on Friday, June 27, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.

Join millions of well-informed readers who use Ground to compare coverage, check their news blindspots, and challenge their worldview.