Pașcani - Suceava highway: a Romanian builder will handle the design and execution of the first batch, 33 km. How much does the work cost
2 Articles
2 Articles
Pașcani - Suceava highway: a Romanian builder will handle the design and execution of the first batch, 33 km. How much does the work cost
The Minister of Transport, Sorin Grindeanu, announced that the winner of the contract for another batch of #A7 (Moldovei Motorway) has been designated, and the design and execution of the first batch, 33 kilometers long, of the Pascani-Suceava motorway sector was awarded to a Romanian builder, for the amount of 3.06 billion lei.
Pașcani-Suceava Highway: First lot awarded to a Romanian constructor for 3.06 billion lei
The Minister of Transport, Sorin Grindeanu, announced that a Romanian constructor has won the contract for the design and execution of the first lot of the Pașcani-Suceava sector, worth 3.06 billion lei.
Coverage Details
Bias Distribution
- 100% of the sources are Center
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage