See every side of every news story
Published loading...Updated

Pașcani - Suceava highway: a Romanian builder will handle the design and execution of the first batch, 33 km. How much does the work cost

Summary by Digi 24
The Minister of Transport, Sorin Grindeanu, announced that the winner of the contract for another batch of #A7 (Moldovei Motorway) has been designated, and the design and execution of the first batch, 33 kilometers long, of the Pascani-Suceava motorway sector was awarded to a Romanian builder, for the amount of 3.06 billion lei.

Bias Distribution

  • 100% of the sources are Center
100% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Adevarul broke the news in Romania on Tuesday, March 25, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.