Mumbai Metro Line-3 Inaugurated: Check Stations, Fares, Timings and Other Details
The 33.5 km fully underground Aqua Line will serve 1.3 million daily commuters and reduce suburban railway traffic by 15%, easing Mumbai's congestion.
9 Articles
9 Articles
Metro Line-3’s full stretch from Aarey JVLR to Cuffe Parade to open for public from today
Mumbai Metro Line 3 (Aqua) Opening Date, Route, Map, Stations List, Timings, Ticket Fares: Get the complete guide to Mumbai Metro Line-3 Aqua: underground route map, station list, fare chart, train timings, frequency & service hours.
Mumbai Metro Aqua Line 3 opens: Route map, stations, fares, timings, airport links & interchange
Mumbai Metro Line 3 (Aqua Line) is a 33.5 km corridor with 27 stations (26 underground and one at-grade) connecting Aarey/SEEPZ, BKC, and South Mumbai (Cuffe Parade). It’s India’s longest fully underground metro line, designed to cut end-to-end journeys to ~54–60 minutes. First trains now depart at 5:55 am; last departures are at 10:30 pm. Fares: ₹10–₹70 (distance-based). Trains run every ~5 minutes at peak. Facilities include platform screen do…
Mumbai Metro 3 Update: MMRCL To Start Passenger Operations Between Acharya Atre Chowk and Cuffe Parade Stations on October 9; Check Timings of First and Last Train Service on Aqua Line | 📰 LatestLY
MMRCL said that they have received the Commissioner of Metro Rail Safety (CMRS) authorisation for passenger operations on Metro Line 3 Phase 2B from Acharya Atre Chowk to Cuffe Parade stations. "From 9th October, #MMRC will serve passengers in its full length from Aarey JVLR to Cuffe Parade daily", the post read. Scroll below to know timings of first and last train services on the Aqua Line. 📰 Mumbai Metro 3 Update: MMRCL To Start Passenger Ope…
Coverage Details
Bias Distribution
- 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium