See every side of every news story
Published loading...Updated

Mumbai – Ahmedabad Bullet Train’s 3rd Bridge Completed over NH-48 by MGCPL

Summary by The Metro Rail Guy
MG Contractors Pvt. Ltd. (MGCPL) last week completed building a 210 meter long balanced cantilever (CLC) bridge under Package P1(B) for the 508.17 km Mumbai – Ahmedabad High Speed Rail (MAHSR Bullet Train) project. This 4-span PSC bridge (GAD-9) over national highway NH-48 is located at Vaghaldhara village near Panchlai in Gujarat’s Valsad district, and has a configuration […] The post Mumbai – Ahmedabad Bullet Train’s 3rd Bridge Completed over …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

The Metro Rail Guy broke the news in on Friday, January 10, 2025.
Sources are mostly out of (0)