Skip to main content
See every side of every news story
Published loading...Updated

Motivair by Schneider Electric announces new CDU with capability to scale to 10MW and beyond for next-gen AI Factories

The MCDU-70 cools up to 2.5MW and scales to over 10MW, addressing rising heat from AI GPUs with centralized controls for global high-density data centers, Motivair said.

  • Jan. 21, 2026, Motivair by Schneider Electric introduced the MCDU-70, a new industry-leading 2.5MW Coolant Distribution Unit now available to order globally from Buffalo, N.Y.
  • GPUs powering AI Factories generate 20 to 50 times more heat than traditional CPUs, and organizations deploying AI clusters face rack power densities projected to reach 1MW and beyond.
  • Engineered with dual heat exchangers and parallel filtration, the MCDU-70 maintains the 1.5 LPM per kW target and undergoes digital twin simulations and end-of-line testing for reliability.
  • Deployed in multiples, the units support gigawatt-scale facility designs with six MCDU-70s providing 4+2 redundancy at 2.5MW each, aligning with NVIDIA Omniverse DSX Blueprint targeting 10MW.
  • Schneider Electric's portfolio now spans CDUs from 105kW to 2.5MW, supporting colocation and hyperscale data centers globally via manufacturing hubs in North America, Europe and Asia.
Insights by Ground AI

12 Articles

NiagaraFallsReview.caNiagaraFallsReview.ca
+6 Reposted by 6 other sources
Lean Left

Motivair by Schneider Electric announces new CDU with capability to scale to 10MW and beyond for next-gen AI Factories

Newly announced MCDU-70 delivers cooling for up to 2.5 megawatts (MW) of power without compromise, preserving full flow performance and facility pressure at gigawatt-scaleWith centralized controls, Motivair’s CDU portfolio is scalable to 10MW and beyond to meet the demands of…

·Niagara Falls, Canada
Read Full Article

Motivair from Schneider Electric introduces a new 2.5 MW CDU (Coolant Distribution Unit). The MCDU-70 is the most powerful Coolant Distribution Unit from Motivair. On a Gigawatt scale, it offers a flexible and scalable solution for the high demands of modern GPUs (Graphics Processing Units) and AI factories. Using Schneider Electric's EcoStruxure software, Motivair's CDUs work as a centralized system and meet current cooling requirements. [...] …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left
50% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

The Record broke the news in Waterloo, Canada on Wednesday, January 21, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal