Published • loading... • Updated
Matlacha Drawbridge test openings, first after Hurricane Ian
Summary by bocabeacon.com
1 Articles
1 Articles
Matlacha Drawbridge test openings, first after Hurricane Ian
The first mechanical opening of the Matlacha Drawbridge occurred this week. It was the first time the bridge had opened since 2022 when Hurricane Ian damaged it. Pine Island-Matlacha area motorists saw crews testing the drawbridge. The amount of time motorists waited for the drawbridge to open and close mirrored what would be a normal wait for a vessel to pass through. Test openings occurred during daylight this week, as this was the first time …
·Boca Grande, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
