See every side of every news story
Published loading...Updated

Local Leader Says Corps’ Price Tag Designed to Undermine Locally Preferred Flood Control Project

Summary by fox40jackson.com
Local leader says Corps’ price tag designed to undermine locally preferred flood control project FLOWOOD, Miss. (WLBT) – A local flood control district is disputing the nearly $1 billion price tag the U.S. Army Corps of Engineers has placed on a Pearl River flood control plan that would promise economic benefits to the metro area. Last week, the Corps released a Revised Draft Environmental Impact Statement that estimates the cost for a flood con…

Bias Distribution

  • 100% of the sources are Center
100% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

SuperTalk Mississippi broke the news in on Friday, July 11, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.

Join millions of well-informed readers who use Ground to compare coverage, check their news blindspots, and challenge their worldview.