Kootenay Silver Delivers Maiden Resource Estimate of 54 Moz at 284 Gpt Silver, Highlighting High-Grade Potential at Columba Project - PressReach
4 Articles
4 Articles
Kootenay Silver Inc. (TSXV:KTN) - Maiden MRE at Columba Delineates 54M oz Ag at 284 g/t Ag - Research Portal
Kootenay Silver (KTN) announced a maiden MRE for its 100%-owned Columba Ag project in Chihuahua, Mexico, delineating an underground inferred resource of 5.92Mt at 284 g/t Ag, 0.19% Pb, 0.05% Zn for ~54.1M oz Ag, 25.2M lbs Pb and 65.6M lbs Zn. This is the key catalyst that we were awaiting for one of our top silver picks (read note). We view the maiden MRE as a key de-risking step for Columba. The MRE came in slightly below our most recent 63.8M o
Kootenay Silver Delivers Maiden Resource Estimate of 54 Moz at 284 gpt Silver, Highlighting High-Grade Potential at Columba Project - PressReach
VANCOUVER, BC, June 17, 2025 /PRNewswire/ – Kootenay Silver Inc. (TSXV: KTN) (OTCQX: KOOYF) (the “Company” or “Kootenay”) is pleased to announce the completion of the maiden Mineral Resource Estimate on its 100%-owned Columba Silver Project, located in Chihuahua, Mexico. This milestone represents a major step forward in advancing Columba Project as a significant silver exploration target and development opportunity. Much of the drilling at Colum…
Kootenay Silver Delivers Maiden Resource Estimate of 54 Moz at 284 gpt Silver, Highlighting High-Grade Potential at Columba Project
Kootenay Silver Delivers Maiden Resource Estimate of 54 Moz at 284 gpt Silver, Highlighting High-Grade Potential at Columba Project President & CEO McDonald states: "It is a starting point of 54 million ounces that sets Kootenay up very well to achieve its objective of defining an economic resource at Columba..." Kootenay Silver Inc. Tue, 06/17/2025
Kootenay Silver Establishes 54 Million Ounce Silver Resource At Columba
Kootenay Silver (TSXV: KTN) this morning published a maiden mineral resource estimate for their Columba Silver project in Mexico, which is one of the flagship assets within Kootenay’s portfolio. The maiden estimate is a based on an underground resource model, with the model based upon over 53,000 metres of drilling within over 200 holes. Highlights […]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium