Published • loading... • Updated
Indre-Et-Loire : Reopening of the Railway Stop at Fondettes-Saint-Cyr-Sur-Loire in 2025
Summary by lemoniteur.fr
1 Articles
1 Articles
Since June 2025, a complete requalification project has been under way for the stopover, led by SNCF Gares & Connexions, in collaboration with Tours Métropole Val de Loire. The aim of this project is to return the stopover to service in December 2025, after almost 30 years of closure. The total cost of this operation amounts to 4.6 million euros, financed equally by the State, the Centre-Val de Loire region and the Métropole.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium