How Environment Agency’s ‘most detailed’ Bim has benefited Bridgwater Tidal Barrier’s design
Summary by New Civil Engineer
1 Articles
1 Articles
How Environment Agency’s ‘most detailed’ Bim has benefited Bridgwater Tidal Barrier’s design
The Environment Agency has funded its “most detailed” building information model (Bim) for the £249M Bridgewater tidal barrier scheme in Somerset, which has resulted in multiple benefits in both the design and construction phases. The post How Environment Agency’s ‘most detailed’ Bim has benefited Bridgwater Tidal Barrier’s design appeared first on New Civil Engineer.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium