Published • loading... • Updated
Harbour Wall Replacement at Weymouth Peninsula to Start This Month - Dorset Eye
Summary by Dorset Eye
1 Articles
1 Articles
Harbour Wall Replacement at Weymouth Peninsula to Start This Month - Dorset Eye
A significant programme of work to replace and strengthen the two main harbour walls which support the peninsula in Weymouth is starting on 13 October and is likely to take 10 months to complete. Recent inspections show the walls of the peninsula to be in very poor condition. As such, they need to be replaced urgently to prevent failure. The current walls, known as F and G, were last repaired in 1977 by Weymouth and Portland Borough Council. The…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium