Planned winter oil drilling in East Greenland by Greenland Energy Company has been postponed after the company landed equipment without prior approval. Greenland’s Ministry of Mineral Resources reprimanded the company, a joint venture partner, after it failed to obtain permission in advance to land the drilling equipment. The equipment was brought ashore on July 29 and 30, after a tugboat towed a barge carrying an excavator and more than a dozen…