Published • loading... • Updated
Ecopetrol and Isa Develop Project to Strengthen Barrancabermeja Refinery
Summary by larepublica.co
2 Articles
2 Articles
Ecopetrol. Image: Valora Analitik Ecopetrol and ISA developed an electrical infrastructure project to improve the operational efficiency of the Barrancabermeja refinery. The work consisted of the construction of two electric distribution lines in simple circuit, each with capacity from 60 megawatts (MW) to 34.5 kilovolts (kV). Savings for US$6 million and lower gas consumption in Barrancabermeja This capacity is equivalent to the energy consumpt…
The work will generate savings close to US$6 million per year, resulting from the reduction of stops due to power failures, the decrease in gas consumption and the optimization of energy costs.
·Bogotá, Colombia
Read Full ArticleCoverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

