Skip to main content
See every side of every news story
Published loading...Updated

Earthworks for Thermal Power Plant No. 5 Are Set to Begin on the 15th of This Month.

Summary by ikon.mn
Prime Minister G. Zandanshatar today (2026.02.03) visited the site of the “Tulaan V Power Plant” project, which aims to meet the growing electricity and heat consumption of Ulaanbaatar and reduce the load on the central energy system. The project is being implemented in the ash pond area of the former CHP2 plant in Bayangol district. The Tulaan V Power Plant is planned to have a capacity to produce 300 MW of electricity and 340 Gcal of heat. It …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

Prime Minister G. Zandanshatar today (2026.02.03) visited the site of the “Tulaan V Power Plant” project, which aims to meet the growing electricity and heat consumption of Ulaanbaatar and reduce the load on the central energy system. The project is being implemented in the ash pond area of the former CHP2 plant in Bayangol district. The Tulaan V Power Plant is planned to have a capacity to produce 300 MW of electricity and 340 Gcal of heat. It …

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

ikon.mn broke the news in on Tuesday, February 3, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal