Draft Pearl River flood control study to be published July 3
3 Articles
3 Articles
Draft Pearl River flood control study to be published July 3
Draft Pearl River flood control study to be published July 3 JACKSON, Miss. (WLBT) – A revised study that evaluates multiple proposals to address flooding along the Pearl River in Hinds and Rankin County will be released later this week. The U.S. Army Corps of Engineers Vicksburg District announced that the Revised Draft Environmental Impact Statement for the Pearl River Basin will be published on July 3. The study is one of several steps that m…
///Photo: Opening Ceremony of "Penang Traffic Day". Seated from left: Lim Siew Chin, Zulkifli, Chow Kon Yeow, Zairil and Fang Bee Lai. /////// The construction of the Pearl Line of the Penang Light Rail Transit is expected to start as early as this month. Currently, it is just waiting for the Minister of Transport and the Mass Rapid Transit Corporation (MRT Corp) to issue the official Notice to Proceed. Penang Chief Minister Chow Kon Yeow said t…
Coverage Details
Bias Distribution
- 100% of the sources are Center
To view factuality data please Upgrade to Premium