Design contract awarded for Comox Valley Water Pollution Control Center upgrades – Water Canada
Summary by watercanada.net
1 Articles
1 Articles
Design contract awarded for Comox Valley Water Pollution Control Center upgrades – Water Canada
The Comox Valley Regional District (CVRD) has selected Carollo Engineers to lead the comprehensive Site Master Plan finalization and detailed design of Phase 4 upgrades at the Comox Valley Water Pollution Control Center (CVWPCC). Originally constructed in the early 1980s with a projected 50-year operating life, the facility requires upgrades to maintain reliable service and increase capacity to support regional population growth. The CVWPCC curr…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium